Building track is a lot of work and so also the platform with a total lengt of 4.75 meter. I follow the Minehead railplan 1900 - 1910 with the small engine depot and turntable. In the corner at the left side the engine house and a small coal loading dock. The other buildings are the station building and a warehouse. At the right side a cattle dock a road bridge and track to the fiddle yard. Some pictures of the progress to look at.
The railplan fitted in the room. |
The stone pattern for the platform siding is made of foam bord. One of the card layers is removed from one side, then I pressed the stone pattern in the foam with my CNC milling machine. After pressing the pattern I painted the foam with acrylic paint.
Result after painting. |
The 2-4-0 Stella arrived at the platform with a passenger train. The Auto coach is waiting for the next run. |
Sunday time al the engines are parked at the side track waiting for the next job.
Dean Goods 2325 arrived with a mineral train. |