Tuesday 9 June 2020

Dutch Scale Seven Group Newsletter 9 June 2020

The building of the Minehead platform is going on. The whole lenght is all most ready covered with tiles en gravel. At the end a new station building has to be build.


View from the signal box on to the platform. The 0-6-0 Pannier 5775 is ready for leaving to Watchet. 
At the left of the picture the small locomotive depot will be with the old engine house. A small turntable is needed for the engines with a tender such as the 2-4-0 Stella  Class.


Last instructions to the driver before leaving the station. 

The tile pattern is pressed into cardboard using my CNC milling machine.

A special formed pressing tool is used for pressing the pattern into the card board. The spindle of the CNC milling machine is not turning. 

The right site of the station at the left site of the picture the yard for the cattle loading dock and goods wagons . 
At the right site of the railway the tracks for the cattle loading dock and storage for goods wagons will build.
All the track is handlaid using C&L bullhead rails and GWR 2 bolt chairs. The slepers are home made. The templates for the points are generated using the Templot track design program.


Goods yard there is still a lot of modelling work to do. 
Till next Cor