In the weekend of 7 and 8 December we presented the S7 layout "Tripton by the Sea " build by Ton Trip at the Modelling Exhibition in Gangelt Germany.
The show was very busy and a lot of people visit the layout and talking with us about modelling railway models and the S7 standards.
We ran a lot of different GWR models build by Ton en Cor. After some little problems the railway was operated for two days. Also we provided shunt movements and made a realistic way of running a model railway. All the engines where equipped with DCC decoders and we had radio controlled handheld controllers so we could walk along the layout talking and operating.
Some pictures of the layout.
|
0-6-0 Saddle tank 2028 waiting with a goods train. |
|
The farmer brings the milk to the station. |
|
Travellers waiting for the next train. |
|
Sealor went home. |
|
Goods train with the 6 wheeled fish wagon |
|
Waiting for the milk train at the loading dock. |
|
The coal trader picks his stock for the coming winter. |
|
Auto coach passed the viaduct. |
|
Auto coach with pannier engine arrived at the station. |
Till next Cor de Jong.
No comments:
Post a Comment